Water Plant Expansion at 15919 ½ Lost Anchor Way Houston, TX 77044
| Move on site with Heavy Equipment | Early May 2020 |
| Test hole drilling & analysis | Late May 2020 |
| Well drilling | July 2020 |
| Testing and site work | August – December 2020 |
| Clean up and move off site | January 2021 |
*There will be some noise due to the drilling equipment. A sound wall will be installed to limit the amount of noise from drilling.